Description: Construction of wooden cubicles and work station including aluminium partition at 4th floor of Nagarayan Building Salt lake City under Salt Lake Reclamation Sub Division I of S L Reclamation Division Name of Work Construction of wooden cubicles and work station including aluminium partition at 4th floor of Nagarayan Building Salt lake City under Salt Lake Reclamation Sub Division I of S L Reclamation Division
Details: XXXXXXXXXXXX Dressed wood work in post , plate , battens . etc. fitted & fixed complete (excluding the cost of bolts only, but including the cost of nails, screws etc.) .(ii) Sal : Local. 4th floor Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film.I) Natural white.j) Fixed partitions. (Unsupported length of vertical member upto 1.5 mtr. Height of both ends of vertical member restrained but panels within 0.9 sq.m.) i) Top , bottom & side member. ii) Intermediate member iii) Glazing clip. Labour charge for fabrication and
Sector: Urban Authority