Description: Construction of A W C at Natungram 19335300109 under Mougram G P within Ketugram II P S Name of Work Construction of A W C at Natungram 19335300109 under Mougram G P within Ketugram II P S
Details: Surface Dressing of the ground in any kind of soil including removing vegetation inequalities notexceeding 15 cm depth and disposal of the within a lead upto 75 m as directed. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches (A)
Sector: District Administration