Description: Tollygunge Wireless Telecommunication Head Quarter Qtr no F 09 Repair and painting with other allied works Name of Work Tollygunge Wirless Telecomncation Head Quarter Qtr no F 09 Repair and painting with other allied works
Details: Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed In First Floor Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing as directed within a lead of 75 m. a) In ground floor including roof. In First Floor Dismantling all types of plain cement concrete works, stacking serviceable materials at site andremoving as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick In First Floor (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] In First Floor Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire net
Sector: PWD