Description: Emergent restoration to Sundarban Embankment damaged due to New moon Kotal from 25 05 2025 to 30 05 2025 for a length of 102 00 M facing river Muriganga at Mouza Kachuberia under Sagar Irrigation Sub Division Name of Work Emergent restoration to Sundarban Embankment damaged due to New moon Kotal from 25 05 2025 to 30 05 2025 for a length of 102 00 M facing river Muriganga at Mouza Kachuberia under Sagar Irrigation Sub Division of Kakdwip Irrigation Division
Details: Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) Supplying to site empty cement polythene bags (capacity 50 kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:-Volume of earth / sand filled bags should not be less than 0
Sector: Irrigation