Details: borrow pit earth for road flenge. pwd(r) 237/3.01 borrow pit earth 89.90/ cost 25/ total 114.90/ [pwd(roads)'15/p-242/it.no.04.09(iv) ]construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for road & bridge works of mort&h (5th revision). for construction of sub base by compacting river bed materials. ordinary cement concrete (1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering & reinforcement if any in ground floor as per relevent is code with river bazree hire and labour charges for shuttering with or without staging upto 4.0 m
Sector: Zilla Parishad