Details: earthwork in excavation in the canals / drainage channels / borrow pits /river bed / of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc.complete as per direction of the engineer-in-charge. (a) ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. cutting,uprooting of roots & stumps of trees of different girth upto 1.0 m depth below ground levelor bed level and filling the root holes by soil and removal of branches, roots & stumps etc. including carriage and stacking as per instruction of the engineer - in – charge. (measurement of girth at height) bamboo cluster banana cluster quarrying, carrying, supplying stone boulders/shingles from the
Sector: Irrigation