Details: making temporary shed for storing fuel, lubricants and other necessary materials by supplying bamboo, durma mat, corrugated iron sheet, rope etc. to carry out the work as per direction of e.i.c. arrangement of diesel engine set & centrifugal pump set of following capacity along with related accessories i.e. hose pipe (upto 10 mtr.), clamp, foot valve etc. on daily hire basis for dewateringfor 7 sets of 7.5 hp [for 92 days during monsoon period] transportation of the above diesel engines & centrifugal pump along with all other necessary materials through any condition of road from agency’s godown to work site including loading, unloading & storage of fuel and lubricants as per direction. temporary installation of the above diesel engine & centrifugal pump including connection of suction and delivery hose pipes and other accessories making arrangement of all materials required for the purpose as per direction of eic. 7 sets of 7.5 hp each incl. all accessories operation, maintenance
Sector: Water supply and Sewerage