Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).(a) with earth obtained from excavation of foundation. laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. cost of boulder (i) cement concrete with graded stone ballast (40 mm size) excluding shuttering.in ground floor. plum concrete work with 40 % cement concrete with 30 mm down gradedstone metal and 60 % stone boulder of size 150 mm and above, placed inposition as directed excludin
Sector: District Administration