Details: foundation work earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge.depth of excavation 3 m to 6 m below existing gl.with pumping out water including shoring as required. labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials.for average depth above 75 mm but not exceeding 150 mm by manual means.stone-metal surface. providing bored cast-in-situ r.c.c. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing
Sector: Road development