Details: earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. pit cutting = (1300x0.50x0.50x0.50)m=162.5 supplying organig manure with carring at site by vichle b) cow dung @ 2kg/plant total quantity = 1300x2kg =2600kg gamhar sonajhuri supplying pesticides. dursban 1 litre @rs 330/litre planting cost including mixing fertilizer, placement of plants into pit, filling the pit with mixed soil and firmly packing, vegetative fencing, gap filling and watering etc. (excluding cost of fertilizer).rate an
Sector: Agriculture Dept