Details: page no-240, item no-3.16 of pwd (wb), schedule of rates : 2018 box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) depth 150 mm. page no-47 of 315, item no-3 of pwd building schedule of rates 2017 supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. [page no-322,item no-18.05(b) of pwd roads schedule] hire and labour charges for shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure inc
Sector: Zilla Parishad