Details: cold milling of bituminous pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under laying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of engineer-in-charge. (i) for depth upto 100mm. wet mix macadam base course: providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including screening of aggregates and granular materials, premixing the material with water at omc in wet mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base cours
Sector: Urban Authority