Details: drain work [page no-284,item no-12.01(i.a.iv) of pwd roads schedule]earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge .i. in all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth.- (iv) without pumping out water and shoring [page no-285,item no-12.02 of pwd roads schedule] earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by department within a lead of 150 m. [page no-47,item no-03 of pwd building schedule]supplying and laying polyth
Sector: Zilla Parishad