Details: earth work in excavation of foundation trenches or drain in all sorts of soils inclouding removing,spreading or stacking the spoils within a lead of 75m. as directed and ramming the bottom, bailing out water etc. as required complete.depth of eacavation not exceeding 1.20m. earth work in filling single brick flat soling of picked jhama bricks including ramming and dressing beg to proper level and filling joints with powdered earth or local sand bottom, bailing out water etc. as required complete. page no-47,item no-03 of pwd building schedule of rates(2017)/supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. (pakur variety) ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nomina
Sector: Zilla Parishad