Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. laying boulder solings including ramming and dressing bed to proper level.... (ii) cement concrete with 30 mm down graded shingles excluding shuttering. n.b. variety in ground floor(a) 1:2:4 proportion ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant is codes. (ii) river bazree r
Sector: Zilla Parishad