Details: sub-head 1--dismantling dismantling the existing ei works & 2nos lt panel from its position with co's own tools & tackels & deposite to the same at departmental store without damaging any spares as per direction of eic reinstallation of the lt panel of the blood bank to the place of main lt panel of the opd after making a base below the panel with brick & cement mortar along with plastering & neat polish etc. as per direction of eic sub-head 2--distribution wiring distribution wiring in 1.1 kv single core stranded 'fr' pvc insulated & unsheathed copper wire (brand approved by eic) in 20/25 mm size pvc rigid conduit 'fr' (precision make) incl. necy. fittings as required 2 x 22/0.3 (1.5 sqmm) + 1 x 22/0.3 (1.5 sqmm) ecc 2 x 36/0.3 (2.5 sqmm) + 1 x 22/0.3 (1.5 sqmm) ecc (for computer board, pp) 2 x 56/0.3 (4 sqmm) + 1 x 36/0.3 (2.5 sqmm) ecc (for pb & rac) 2 x 84/0.3 (6 sqmm) + 1 x 56/0.3 (4 sqmm) ecc (from pbdb to lbdbs) finishing of the pvc insulated wire ends by socketting wi
Sector: PWD