Description: Construction of new school building of Algarah Primary School at Kalimpong Block I under Education Department GTA Name of Work Construction of new school building of Algarah Primary School at Kalimpong Block I under Education Department GTA under Education Deptt GTA
Details: Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).(a) With earth obtained from excavation of foundation. Brick soling with picked jhama bricks including preparation of bed as necessary, with brick joints properly filled in and packed with powdered earth and including necessary cushion of similer material below the soling (and in between layers when more than one layer is used) complete as per direction.(b) Double brick f
Sector: District Administration