Details: dismantlingr.c. floor,roof,beamsetc. including cutting rods and removing as directed within a lead of 75m. includingstackingof steel bars. hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(when the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of engineer-in-charge supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. ordinary cement concrete (mix 1:1.5:3) with graded
Sector: Road development