Details: survey of h.t cable route as per instruction of site engineer and submission of route survey drawing ( in two copies) inscribing different land marks excavation of soil for making of trial hole ( minm. size 1.1 x 0.5 x 1.2m depth ) as per instruction of the site engineer including backfilling the excavated soil. supply of kiln-burnt 1st class bricks having proper size & shape suitable for cable protective cover and laying of bricks as per drawing and instruction of the site engineer laying & dressing of 11 kv xlpe 3 x 185/240 sq. mm. cable in the excavated cable trenches as per instruction of the site engineer. supply and fixing of straight through jointing kit including making of jointing pit for 11 kv xlpe 3 x 185/240 sq. mm. cable supply and fixing of end termination jointing kit outdoor type for 11 kv xlpe 3 x 185 sq.mm. cable including fixing of the jointing box at the existing structure as per instruction of the site engineer. supply & fixing of g.i pipe 100mm dia.(medium) as p
Sector: Distribution