Details: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.loose or soft soil. laying (first class) bedding on well compactedsand, moored or approved granular material asper clause 1105 (ii) for rural roads of mord stone shingles 63mm to 37.5mm ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. hire and labour charges for shuttering with orwithout staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steelsheet plate with required bracing for any kind ofplain or reinforced concrete works in all sorts ofminor structure
Sector: Zilla Parishad