Details: s&p page no. 49, item 1(d)labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. the tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.(d) for depth upto 150 metre for 50 mm dia. tube well with top of 100 mm dia.(ii) 100 mm dia. boring etc. top enlargementboring s&p page no. 3, item 2(ix)supplying, fitting and fixing in position g.i. pipes of tata make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, , short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil a
Sector: Zilla Parishad