Details: part-i hiring skilled & unskilled manpower for dept. rig unit & hiring supporting vehicle providing casual labours on hiring basis having knowledge of drilling works through rig machine and to be posted at camp site for round the clock drilling and allied work. it involves movement of materials from d.c.c premisses to camp site & material loading, handling, unloading, preparing the drilling sites, necessary earth work, surface dressing, cutting trench, pits, refilling the mudpits, guarding the govt. materials from progress to completion of drilling works as per direction of e.i.c.unskilled manpower @ 5 nos. x 02 shift/day. for 4 days i.e. total( 3 x 05 x02 x 04)=120 nos providing highly skilled rig operator [driller] on hiring basis having sufficient knowledge of operation of similar type rig units performing drilling operation/works through rig machine and to be posted at camp site for round the clock drilling operation, maintaining log of diff. works, attendance and supervising
Sector: Water supply and Sewerage