Description: Construction of New High Mass LED Solar Light infront Jumma Masjid at Bachahar under Karkach Gram Panchayat Act Id 109616047 AAP Sl No 77 Wrok Name Construction of New High Mass LED Solar Light infront Jumma Masjid at Bachahar under Karkach Gram Panchayat Act Id 109616047 AAP Sl No 77 SL08
Details: Material for civil construction including Sand, Stone & Cement. Transportation through GP store Room to actual Location Supply of Swagged Type Steel Pole Designation 410 sp-12 Overall Length 9.00 m Planting Depth 1.5 m Length Of Section Buttom(5.00m) Middle(2.00m) Top(2.00m) Outside Dia & Thickness Of Section Approx - Buttom(139.7 X 5.40) Middle(114.3 X 4.85) Top(88.9 X 3.25) Approx Weight Of Pole 113 Kg. 12 volt -100 wp Solar PV-Module. (HR , Vega ,Vikram, Synergy). supply 30wt Luminior (LED) Base out door system with PIR motion sensor. Supply of 12 volt - 300Wh / 25 Ah Lithium Ion Battery with PIR motion sensor (HR Solar,Vega Solar,Vikram) 7 Wire 4 mm, 2core (ISI Mark) 20.00 MTR 50.00 MTR 1000.00 Istallation with Technical supervision Scheme Name Board/Sticker Add for GST@18%= Add, cess @1.00 % Add contengincy
Sector: Zilla Parishad