Details: earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. cost of stone boulder 150 mm size delivered ans stacked at site. (i) cement concrete with graded stone ballast (40 mm size) excluding shuttering.in ground floor.(b) with n.b variety stone metal.(a) 1:3:6 proportion. ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant is codes.(b) river bazree. plum concrete work with 40 % cement concrete wit
Sector: District Administration