Description: CIVIL WORKS Name of Work M R to Dy No 30 of K B C in between Ch 100 00 Ch 177 73 under Bengai Section of K C Sub Division No X under K C Division No III Bishnupur Dist Bankura during the year 2025 26
Details: Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Sector: Irrigation