Details: earthwork in excavation in foundation trenches in all sorts of soils including removing the spoils within the lead of 15.0m as directed.(a) p-229,i-11, labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. labour for shuttering with centering with approved stout props and thick hard wood planks of approved thickness including fitting, fixing and striking out after completion of work. (1:2:4)) c.c. with 20mm down bazree with materials supplied at site excluding shuttering.(enclosed rate analysis) display board gst 18% labour cess 1 %
Sector: District Administration