Details: survey of cable route as per instruction of site engineer fixing of t.p.g.o. isolator 11kv on line of d.p. by wpb pole 12.8mtr with fittings fixing of pin insulator 11kv microtunnelling work with laying of hdpe pipe as per instruction of site engineer and as per site condition including supply of hdpe pipe as per is: 4984 : 1995 including preparation and submission of as built drawing with 160mm dia hdpe pipe, pe 80, pn-6. excavation of soil for formation of trial hole having minimum size 1.1 x 0.5 x 1.2 m in total cable route as per specification and direction of the site engineer excavation of soil (metal ,asphalt ,normal soil) for formation of cable trench and reinstatement of the cable trench with the excavated soil after completion of laying and dressing of 1 nos 11kv 3x300 sqmm xlpe ug cable and cable protection work as per specification and direction of the site engineer. size of cable trench should be at least 900x500 mm and the depth must not be less than 900 mm with 75
Sector: Distribution