Details: page no. 189, item no. 1 plaster (to wall, floor, ceilling etc.) with sand - cement - mortar including rounding off and chamfering corners as directed and racking out joints including throuting, noising and drip cone, scaffolding / staging where necessary (ground floor) (excluding cost of chipping bror concrete surface)i) with (1:4) plaster inside wallc) 15mm thick page no. 34, item no. 22(ii) cement concrete with graded stone singles (30 mm size excluding shuttering) in ground floor (100 mm thick)(b) (a) with n.b variety stone metal 1:3:6 in proportion page no. 114, item no. 1wood work in door and window frame fitted and fixed in position complete, including a protective coat of painting at the contact surface of the frame excluding cost of concrete, iron hinges and m.s. clamps (the quantum should be corrected upto thre decimals)d) sal : local page no. 117, item no. 1panel shutters of door and window as per design (each panel consisting of single plank without joint) including fitt
Sector: School