Details: submersible earthwork in excavation in foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sand stone) icluding removing, spreading & stacking the spoil within a lead of 75m as directed. the item includes necessary trimming the sides of trenches. levelling, dressing and ramming the bottom, bailing out of water as required complete. earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete.a) with earth obtained from excavation of foundation. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. cement concrete with graded stone ballast (
Sector: Zilla Parishad