Details: work of bsf kushmandi earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. filling in foundation or plinth by silver sand in layers not exceeding 150 mm. as directed and consolidating the same by thorough saturation with water ramming complete, including the cost of supply of sand. (payment to be made on measurement of finished quantity) (b) do-by fine sand 1/5 of excavation of foundation 24.83m3 for plinth. single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local san
Sector: Agriculture Dept