Details: solar submarshel (item no-2 (a) ,page no-1) earthwork in excavation in foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading & stacking the spoil within a lead of 75 m as directed. the item includes necessary trimming the sides of trenches. levelling, dressing and ramming the bottom, bailing out of water as required complete. (item no-3(a) ,page no-1) earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (item no-1,page no-14) single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. (item no-b 1 (i) ,page no-23) cement concrete with graded stone chips (item no-(16) ,page no-16) 125 mm thick brick work with 1st class bricks in cement mortar (1:4) brick work with 1st class bricks in cement morta
Sector: Zilla Parishad