Details: labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking. labour for taking out old soling edging including removing debris (b) double flat soling excavation for structures earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the engineer-in-charge. (iv) without pumping out water and shoring providing and laying reinforced cement concrete pipe np3 as per design in single row providing and laying reinforced cement concrete pipe np3 with spigot socket for culverts on first class bedding of granular material in singl
Sector: Urban Authority