Details: labour for boring tubewell of required dia. by water jet system through any kind of soil, strata including hire and labour charges for boring pipes, scaffoldings, othertools and plants as necessary and taking out them and lowering pipes and strainers, blank pipe etc. and fitting, fixing the same complete including bucket washing and other incidental works in this connection. (the tubewell should have a minimum 50 mm gap in between the outside of tubewell pipe and bore).a) for depth upto 150.00 mtr. for 40 mm diatubewell with of 80 mm dia.a>80 mm dia. labour for boring tubewell of required dia. by water jet system through any kind of soil, strata including hire and labour charges for boring pipes, scaffoldings, othertools and plants as necessary and taking out them and lowering pipes and strainers, blank pipe etc. and fitting, fixing the same complete including bucket washing and other incidental works in this connection. (the tubewell should have a minimum 50 mm gap in between the o
Sector: Zilla Parishad