Description: CC PROTECTION WALL AT BAYRA PARA AT SANSAD XV Name of Work Construction of Protection Wall at Gaji Para to Bayer Para at Kalikapota Il Gram Panchayet P S Magrahat 1 Dist South 24
Details: Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc.layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(b) With earth obtained by fresh excavation (including cost of excavation upto 1800 mm depth) from land arranged by the Deptt. within a lead of 100 M Construction of necessary Display Board including Setting of marble tiles with necessary lettering etc. toDisplay the schematic Details, as per instruction of IC. 8 copies of Photo Pre Work, At the time of Work in progress and Post Work with thermocol at Construction joint EC bullah pilling with labour and material of ballah piles, labour for coal tarring on woodensurface,dressing making one end pointed,driving UC bullah piles by monkey and fitting and fixing 10 cm to 13 cm dia EC bullah as ties and runners including necessary nails,bolts and nuts Add 18% SGST Add 1% L.W. Cess
Sector: Zilla Parishad