Details: earthwork in excavation in all sorts of soils including removing trimming the sides of tranches leveling, dressing and of stacking spoils with a lead of 75 m as direction including ramming the bottom bailing out balance water etc required complete depth of excavation not exceeding 1.20 150 mm single boulder soling including ramming and dressing bed to proper level and filling joints with powdered earth / sand including cost of materials. w.c.c. (1:3:6) with 30 mm down graded stone metal including shuttering if any placing, mixing concrete, curing including cost of all labour materials and carriage upto the work site all complete as per direction of eic. cement concrete (4:2:1) with stone chips 20 mm down graded excluding shuttering and reinforcement if any with balaon variety stone aggregates and sand. cement concrete (1 : 1 1/2 : 3) with down graded stone chips excluding shuttering with balason variety stone aggregates and sand. hire and labour charges for shuttering necessary staging
Sector: District Administration