Details: (item no. 8, page no. 11 of pwd building schedule (2017) (3rd corrigendum)taking out carefully g.c.i. or c.i. or asbestossheets (including ridges etc.) from roof or wall after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. (item no. 4(b), page no. 24 of pwd building schedule (2017) (3rd corrigendum)ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes.i) nb variety (page no. 15, item no. 7(b), of pwd building schedule (2017) (3rd corrigendum)brick work with 1st class bricks in cement mortar (1:4)(b) in superstructure, ground floor (item no. 16, page no. 016 of pwd building schedule (2017)125 mm. thick brick work with 1st class bricks in cement mortar (1:4) inground floor. in ground floor (page no. 66 ,item no. 36 (i) (a) of pwd building schedule (2017) (3rd corrigendum)supplying and laying true to line and level vitrified tiles of appro
Sector: Zilla Parishad