Details: cleaning and removing conservancy garbage mixed with & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by mathor labour & removing the same to any distance. carriage of sand, moorum and similar materialss over pucca road (local carriage at sandakphu road 0.56 /trip). clearing and grubbing road land clearing and grubbing road land including uprootingwild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to beused or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specifications clause 201 for rural roads of mord. by manual means a) in area of non-thorny jungle.
Sector: PWD