Details: construction of cover drain earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. filling in foundation or plinth by fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (payment to be made on measurement of finished quantity) single layer brick flat soling of picked jhama bricks including and dressing bed to proper level and filling joints with powdered earth or local sand. hire and labour charges for shuttering with centering and necessary staging upto 4 m
Sector: Zilla Parishad