Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. stripping off worn out plaster and racking out joints of walls, ceilings etc. upto any height and in any floor including removing as directed within a lead of 75 m. dismantling all types of masonry excepting plain cement concrete of reinforced, stacking serviceable materials at site and removing as directed within a lead of 75m. a) in ground floor including roof dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75m. in ground floor including roof a) upto 150 mm thick. di
Sector: Distribution