Details: box cutting or filling in road embankment in all sorts ofsoil including spreading the spoils properly over theflank as necessary or on berm to approximate grade& camber and rolling the sub-grade with power rollerto proper camber and grade as per direction andsatisfaction of engineer-in-charge including uprootingand removing plants and jungles when and wherenecessary. (a) depth up to 150 mm. earthwork in excavation from borrow pits (landowned/arranged by the department) and depositingin layers of 250 mm. including breaking clods inembankment works and to fill up back of abutments,depressions and ruts with an initial lead up to 50 m andinitial lift up to 1.5 m making bunds at top as directeddressing complete. (borrow pit measurement) (i) in ordinary soil b. by mix in place method :-construction of granular sub-base by providing graded material, mixing by mix in place method with rotavator at omc, spreading in uniform layers with motor grader on prepared surface in proper grade and camber
Sector: Zilla Parishad