Details: contraction of swish gate earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, hailing out water as required complete (c)depth of excavation for additional depth beyond 3000 mm up to 4000 mm.excluding cost of shoringas necessary (b)depth of excavation for additional depth beyond 1500 min up to 300 mm.excluding cost of shoringas necessary. hire and labour charges for shoring work (including necessary close plank walling framing, eucalyptus/jhou bulla piling, strutting etc) complete as per direction of the engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured) (this stem should be executed on specific direction of the enginner in charge(b)for additional