Details: supply & installation of high mast light a) earthing work in excavation of foundation trenches or draines in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spils within a lead of 75 mm as directed. the item includ-es necessary trimming the said trenches leveling, dressing and ramming the bottom bailing out water as required complete. i) depth of excavation upto 1500mm. (as per p.w.d schedule 2014 sec-1 (a) , page no. 01, sl. no. 2(b)) [ л/4x5.1²] = 20.44m² ii) depth of excavation for additional depth beyond 1500 mm and upto 300mm. but not required shoring (as per p.w.d schedule 2014 sec-1 (a) , pg no. 01, sl. no. 2(b)) [ л/4x5.1²] = 20.44m² earthwork in filling infoundation trench -es or plinth with good earth in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. with earth obtained from excavat
Sector: Zilla Parishad