Details: supplying, laying, fiting, fixing and jointing of upvc pipes conforming to is:4985-2000 with latest revision and amendments, if any, with necessary upvc/ci specials, cidf sluice valves, as per relevant i.s. specification including labour charges for earth work in excavation in any kind of scil including mixed soil with boulder ,road sub-grade and its fanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as
Sector: Water supply and Sewerage