Details: electrical (maintenance works) and operation & maintenance works of pump- motor sets.note:all the item of sor of pwd electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% gst & 1% labour cess)( the work shall continue of the entire contract period as per the requirement & as directed by the engineer in charge .the payment of the executed work shall be made on the basis of pwd schedule of rates & as per the annexure - 2023/2 for non-schedule items.) day to day operation of pump- motor sets and emergent ei maintenance works supply of manpower for operation of pump motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works and repair , maintenance of electrical installation as and when required for a period of 365 days as per direction of eic. location details of -electrician pump operators (skilled) :-a) sp office , badamtala phe &
Sector: Police and Internal Security