Details: construction boundary wall, land development at head work site earthwork in excavation in foundation trenches or drain in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading & stacking the spoil within a lead of 75m as directed. the item includes necessary trimming the sides of trenches. levelling, dressing and ramming the bottom, bailing out of water as required complete.(a) depth of excavation not exceeding 1500 mm. earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete.a) with earth obtained from excavation of foundation. earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (payment will be made on profile measurement before and after the work). a) with earth obtained from excavat
Sector: Water supply and Sewerage