Details: earth work in excavation of foundation trenches drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading ----etc.-----etc.—as required complete. a)depth of foundation not exceeding 1.50 m. earth work in filling in foundation trenchesor plinth with good earth in layers not exceeding 150mm including watering and ramming etc. layer by layer omplete. filling in foundation or plinth by fine sand in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. single layer brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand cement concrete with 30mm down graded stone shingle excluding shuttering in ground floor. (i) 6:3:1 proportion ordinary cement concrete with grade river bazree(1:2.4) (20mm size) excluding shuttering and rein
Sector: Zilla Parishad