Details: earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the soils within a lead of 75m as directed (a) depth of excavation not exceeding 1,500 mm filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water. ramming couplete including the cost of supply of sand (payment to be made on measurement of finished quantity) single brick flat soiling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand ordinary cement conerete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant is codes a) pakur variety artificial stone in floor, dado, staircase ete with cement concrete (1:2:4) with stone clups, laid in panels as directed with to
Sector: Zilla Parishad