Description: Design, Supplying. Fabrication, and Commissioning including 3 (three) months Trial Run of 100 m3/hr and 2 No. 50 m3/hr capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head
Sector: Water supply and Sewerage