Details: earthwork in excavation of field trenches as per designed section & alignment for laying of pipelines (pvc, rcc, acp etc) upto a depth of 1500 mm in all sorts of soil including removing spreading or stacking extra extra earth as directed. the item includs necessary trimming of sides trenches, leveling, derssing and ramming the bottom as required complete. laying of p.v.c. pipes of different diameters within field trenches in curve /straight line using p.v.c. fittings, viz. bend, tee, reducer etc. and making leakproof joints with couplers after roughening the surface with wire brush andemery paper and applying solvent cement (the rate is inclusive of transport ofpipes, fittings and solvent cement to be supplied by deptt.) all complete as per direction of engineer-in-charge. (iii)140mm dia upvc labour charge for replacement of damage pvc. pipe of any length in the pipe line of hdtw /mdtw /rli with new piece/s of pipe after taking out thedamag
Sector: Water Resource Department