Details: construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 for rural roads of mord. (mode of measurement: pre works and post works) construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 for rural roads of mord. (mode of measurement: pre works and post works)(b) carriage up to total lead of 2.0 km. carried earth. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound mac
Sector: Urban Authority